Project Location
Covington, Louisiana
Project Type
Civil Engineering
Project Description
Fairway Consulting + Engineering, LLC (Fairway) is the lead civil engineer responsible for civil improvements associated with an expansion of the Covington Elementary School. Fairway designed all site civil improvements for the 2.7 acre site inclusive of paving, grading, drainage, and utilities. The improvements are required in order to accommodate the construction of a new 29,000 square foot 2-story classroom building that will replace existing modular buildings. The project will also include a new covered walkway and an ADA-accessible playground. Drainage improvements include both open channel and closed conduit subsurface piping. All drainage infrastructure was designed for a 10-year storm event.