Meadow Lake/Cross Gates Water System Interconnection

Project Description
Project Location

Slidell, LA


Project Type

Water/Wastewater


Project Description

Fairway Consulting and Engineering, LLC (Fairway) is the prime firm responsible for the design of an interconnection between the Meadow Lake and Cross Gates Water Systems operated and maintained by Tammany Utilities (TU). The design scope of work included preparation of plan and profile drawings for approximately 3,800 linear feet of 10-inch water main. The project design includes one (1) surface water crossing, and installation of the water main by horizontal directional drilling (HDD) techniques. The project was completed under an aggressive schedule and required close coordination with the Louisiana Department of Transportation and Development (DOTD) and the Louisiana Department of Health (LDH).